Open Tenders

PAR24476 DMMF Paint Shop, Lead Professional Services Consultant

Agency
Urban Renewal Authority (trading as Renewal SA)
State
South Australia
Type
Request for Tender
Category
Professional engineering services
Closing Date
1 Dec 25
Link
PAR24476 DMMF Paint Shop, Lead Professional Services Consultant

Renewal SA are seeking to engage the services of an appropriately experienced, qualified, and capable Lead Professional Services Consultant (LPSC) to work with Renewal SA to perform the role of Lead Consultant to successfully design a specialised aircraft paint facility. The intent of this procurement is for Renewal SA to directly engage the Lead Consultant for the initial design phase services to work through an ECI process until approximately 70% Detailed Design, at which point the Lead Consultant will be novated over to the Principal Contractor, as part of their D&C team.The procurement documentation will ask the LPSC to outline their fees for all stages, to allow Renewal SA to get an indicative understanding of the totality of design fees, however the contractual scope will only include the first three stages (pre-novation).The LPSC will be responsible for the coordination of all required design disciplines and obtaining any required Subject Matter Experts (SME’s) advice to comprehensively deliver the design of the DMMF Paint Shop. The facility will support industry leading, technologically driven, efficient, and environmentally compliant painting operations for aircraft including surface preparation, painting, curing, and associated support services. The LPSC will deliver the initial design phases with later engagement with an ECI contractor. The next phase will be a D&C Contract to deliver a solution for final facility operator fit out and operational use. The project will consist of an initial stage, and then 4 primary design stages as outlined below.Pre-NovationStage 1: Preliminary Review and Return BriefStage 2: 30% Concept DesignStage 3: 70% Detailed Design Post-NovationStage 4: 100% Design and NovationStage 5: Construction phase and DLPThe procurement documentation will ask the LPSC to outline their fees for all stages, to allow Renewal SA to get an indicative understanding of the totality of design fees, however the contractual scope will only include the first three stages (pre-novation).

Our relevant experience

We are the perfect partner to help you respond to this opportunity. Below is a selection of some previous similar submissions we have completed.

Department of Customer Service

GWIC – Tracking and Monitoring

Gladstone Ports Corporation

Hydrographic Survey Support

Property NSW

Whole of Government Facilities Management Services (Asset Maintenance and Cleaning)

NSW Rural Fire Service

Field Mapping - Software Licensing Package

Australian Fisheries Management Authority

Licensing and Data Services to the Commonwealth of Australia

Bureau of Meteorology

Software Licences, Implementation Services and Ongoing Support for an Electronic Document and Records Management System

Office of Sport (Sport and Recreation)

Website Development, Training and Hosting

David Jones

e-commerce/e-tail Services

Titles Queensland

Digitisation and Disposal of Historical Titling Records

Digital Transformation Agency

Hardware Marketplace

Digital Transformation Agency

Cloud Marketplace

Digital Transformation Agency

Cloud Marketplace

The Department of Health

Build and Operate of the Mental Health Gateway

TransGrid

Transmission Line 39 330kV Cable Design and Construct Deviation Works

Water Authority of Fiji

Design and Project Management Proposed Sigatoka Wastewater Pump Station and Gravity Line

Endeavour Energy

Trenchless Design and Associated Services

Department of Defence

Relocation and Fit Out Works

Department of Defence

Australian Defence Force Academy (ADFA) Duntroon Civil Works

Sydney Water

Sydney Water Request for Proposals for Asset Data Collection Services (Data Integrity Project 2)

Lower Macquarie Water Utilities Alliance

Pumping Station Audit and Report - LUWUA