Open Tenders

Wodonga - Leneva Spine Sewers - Package 1 Sewer Crossing

Agency
North East Water
State
Victoria
Type
Request for Tender
Category
Water and sewer utilities - (50%)
Closing Date
10 Nov 25
Link
Wodonga - Leneva Spine Sewers - Package 1 Sewer Crossing

North East Water (NEW) is seeking to engage a suitably qualified Principal Contractor under a Design and Construct (D&C) contract for the construction of gravity spine sewers in Leneva, Wodonga. These spine sewers will form critical infrastructure to enable development to occur within the Leneva growth area. The works will include installation of the sewer crossings via trenchless methods under both Baranduda Blvd and Middle Creek. It will also include a temporary connection into the existing Middle Creek SPS and installation of a return line to send peak flows to the Baranduda WWTP during wet weather events. The Principal Contractor will be responsible for all associated works, including but not limited to the following:· Detailed Design of all components outlined below (preliminary design will be supplied by the Principal).· Obtaining all necessary approvals and permits.Spine Sewer 1· Open cut installation of DN1000 GRP Gravity Sewer (approx. 10m, approx. 8-9m depth).· Trenchless installation of DN750 GRP Gravity Sewer (approx. 210m, approx. 8-9m depth).· Supply and installation of DN2400 MH1-1 (Inc drop boards) approximately 8-9m depth to invert· Supply and installation of DN2100 MH1-2 and MH1-3 (Inc drop boards) approximately 6-8m depth to invertSpine Sewer 2· Trenchless installation of DN600 GRP Gravity Sewer (approx. 65m, approx. 6-7m depth).· Supply and installation of DN1800 MH2-1 approximately 6-7m depth to invertSpine Sewer 3· Trenchless installation of DN600 GRP Gravity Sewer (approx. 75m, approx. 8-9m depth).· Supply and installation of DN2100 MH3-1 approximately 8-9m depth to invertTemporary Connection into Middle Creek SPS and Return Line· Open cut installation of DN300 Gravity Sewer (approx. 85m, approx. 8-9m depth) to connect spine sewers into existing Middle Creek SPS.· Supply and installation of DN1800 MH1342 approximately 8-9m depth to invert· Return Line (Rising Main) to Baranduda WWTP – approx. 240m DN315 including associated valves and fittings.· Actuated valves and pits.

Our relevant experience

We are the perfect partner to help you respond to this opportunity. Below is a selection of some previous similar submissions we have completed.

RSL LifeCare

Kaleen - Stage 2

Port Authority of New South Wales

Security Services for Cruise Day Operations and Port Facility Asset Protection

Greater Geelong City Council

Plumbing Services

City of Perth

E-Scooter Share Scheme Service

Department of Defence

Cafe and Barista Services

AusNet

AusNet Aerial Services

ANZ

Locks and Combination Safe Services

Infrastructure Canberra

Property Trades Services Panel

Pilbara Ports Authority

Vessel Pilotage Services

Botanic Gardens of Sydney

The Domain Gateway

Townsville City Council

E-Mobility Operations

Kilcoy Global Foods

Domestic Transport Services

WSA Co

GSE Pooling – Market Driven Solution

Department of Climate Change, Energy, the Environment and Water

Electric vehicle destination charging grants

Stanwell Corporation

Supply of Bulk Fuel

John Deere

AU/NZ Road/Warehousing

NSW Procurement

Talent Acquisition Scheme

dnata

Labour Hire

Melbourne and Olympic Parks Trust

Marketing and Communications Services Panel

Hills Shire Council

Commercial and Retail Property Leasing and Managing Agent